BUILDING STATISTICS
GENERAL BUILDING DATA
OWNER
PRIMARY PROJECT TEAM
BUILDING NAME
LOCATION
440 FIRST STREET, NW
WASHINGTON,D.C
FP 440 FIRST STREET, LLC
GENERAL CONTRACTOR
OCCUPANCY
OFFICE/RETAIL
ARCHITECT
SIZE
NO. OF STORIES
BUIILDING COST
141,929 S.F
$20,000,000
11(ABOVE GRADE)
CIVIL ENGINEER
STRUCTURAL ENGINEER
MEP FIRE PROTECTION
LIGHTING CONSULTANT
SPECIFICATIONS WRITER
LEED CONSULTANT
CODE CONSULTANT
COMMISSIONING AGENT
THIRD PARTY REVIEW CONSULTANT
VERTICAL TRANSPORTATION
BETHEL SPECS.
EXISTING CONSTRUCTION
ARCHITECT
VLASTIMIL KOUBEK, AIA
STRUCTURAL ENGINEER
BASKAM & JURCZYK, P.C.
MECHANICAL& ELECTICAL ENGINEERS
THE OFFICE OF LEE KENDRICK
ARCHITECTURE
440 FIRST STREET, NW, IS LOCATED BETWEEN D AND E STREETS IN DOWNTOWN WASHINGTON, D.C. NEAR THE UNITED STATES CAPITOL. THE EXISTING 8-STORY BUILDING WAS CONSTRUCTED IN 1982 AND HAD NO SIGNIFICANT UPGRADES UNTIL THE RENOVATION WAS INITIATED IN 2012. THE ADDITIONAL 34,500 SUARE FEET EXTENDED THE STRUCTURE THREE FLOORS VERTICALLY AND THUS ACHIEVED A TOTAL NUMBER OF 10 FLOORS AND A NEW MECHANICAL PENTHOUSE. THERE ARE TWO EXISTING BELOW GRADE PARKING GARAGES, WHICH WERE REPAIRED AND UTILIZED AS A VALET PARKING FACILITY.
APPLICABLE CODES
BUILDING: INTERNATIONAL BUILDING CODE (2006)
MECHANICAL/ELECTRICAL/PLUMBING: NATIONAL BUILDING CODE (2005), INTERNATIONAL BUILDING CODE (2006), INTERNATIONAL MECHANICAL CODE (2006), INTERNATIONAL FUEL GAS CODE (2006)
ENERGY: INTERNATIONAL ENERGY CONSERVATION CODE (2006)
FIRE: INTERNATIONAL FIRE PREVENTION CODE (2006)
ACCESSIBILITY: ADAAG (2003), ANSI 117.1 (2006)
ELEVATORS AND ESCALATORS: DC GREEN BUILDING ACT (2006), DISTRICT OF COLUMBIA ENVIRONMENTAL POLICY ACT (1989)
ZONING DATA
THE ZONING OF 440 FIRST STREET IS IN ACCORDANCE TO STANDARDS FOR D.C. ZONE C-3-C, SQUARE 571, LOT 55.
BUILDING ENCLOSURE
THE EXISTING BUILDING SKIN (FACADE), CONCRETER ROOF AND PENTHOUSE WAS COMPLETELY REMOVED AND THE BUILDING WAS RE-CLADDED WITH CURTAIN WALL ON THE NORTH FACADE AND ALUMINUM AND GLASS WINDOWS IN BRICK SPANDRELS ON THE REMAINING SIDES.
THE NEW FACADE NOW STANDS AS A UNITIZED GLASS AND METAL CURTAIN WALL SYSTEM, THUS CREATING A MORE MODERN AND EXPRESSIVE ARCHITECTURAL LOOK.
SUSTAINABILITY
ROOFING
THE EXISTING BUILDING WAS RE-USED AND TRANSFORMED INTO A NEW, SUSTAINABLE, STATE-OF-THE-ART BUILDING.
GREEN ROOF WILL HAVE LOCAL PLANTS THAT REQUIRE MINIMAL WATERING AND ALSO REDUCES STORM WATER OVERFLOW AND MINIMIZES "HEAT ISLAND" EFFECT.
RECYCLED MATERIALS ARE USED AND ARE OBTAINED REGIONALLY.
THE BUILDING HAS ACHIEVED LEED PLATINUM CERTIFICATION.
440 FIRST STREET HAS A FLAT ROOFING MEMBRANE, WHICH IS CALLED A PVC SYSTEM. IT IS A SINGLE-PLY ROOFING MEMBRANE MADE OF THICK AND VERY FLEXIBLE THERMOPLASTIC MATERIAL.
THE ROOFING ALSO CONSISTS OF 4" RIGID INSULATION (MIN.) ON METAL DECK.
THE MAIN ROOF CONSISTS OF A ROOF TERRACE WITH SEATING AREAS AND OUTSTANDING VIEWS.
HISTORICAL/ ZONAL REQUIREMENTS
MAXIMUM BUILDING HEIGHT
BY RIGHT (770.1) - 90 FEET
WITH TRANSFER DEVELOPMENT RIGHTS (1709.23) - 110 FEET
PRIMARY ENGINEERING SYSTEMS
STRUCTURAL
THE EXISTING BUILDING IS A CAST-IN-PLACE CONCRETE STRUCTURE CONSISTING OF TWO-WAY STRUCTURAL CONCRETE SLABS AND REINFORCED COLUMNS. A CONCRETE SLAB-ON-GRADE OCCURS AT THE LOWEST LEVEL OF THE GARAGE, WHILE THE CONCRETE COLUMNS AND FOUNDATION WALLS ARE SUPPORTED BY SPREAD FOOTINGS. THE ADDITION OF THREE STORIES OF STEEL FRAMING (TWO NEW FLOORS AND A ROOF/PENTHOUSE) ABOVE THE EXISTING 8TH FLOOR. THE NEW FRAMED FLOORS AND ROOF ARE CONSTRUCTED USING COMPOSITE FRAMING WITH 5 1/4 INCH THICK SLAB (COMPRISED OF 3 1/4 INCHES OF LIGHTWEIGHT CONCRETE FILL ON A 2 INCH THICK METAL DECK) AND BEAMS SPACED AT APPROXIMATELY 10'-0". GIRDERS WILL SPAN BETWEEN COLUMMNS AT 20'-0" A COLUMN LAYOUT FOR THE ADDITION THAT CREATES INTERIOR COLUMN FREE SPACE BY ELIMINATING THE FIRST INTERIOR COLIMNS ON THE EAST SIDE OF THE BUILDING. THE NEW COLUMNS ARE TYPICALLY 10 INCH WIDE BY 10 INCH DEEP.
FRAMING RENOVATIONS
THE EXISTING ROOF SLAB AND PENTHOUSE WILL BE REMOVED, AND THE SLAB EXTENSION AT FLOORS 2 - 8 OCCURS AT THE EAST SIDE OF THE BUILDING TOWARDS THE NORTH, TO MATCH THE NEW UPPER FLOORS.
MECHANICAL
DURING THE RENOVATION OF 440 FIRST STREET, THE PRIMARY MECHANICAL DEDICATED OUTDOOR AIR SYSTEMS (DOAS) WERE REPLACED AND RESULTED IN A 25 PERCENT REDUCTION IN ENERGY USAGE. IT CONSISTS OF THREE MECHANICAL ROOMS HOUSED IN THE PENTHOUSE AND 2 COOLING TOWERS ON THE PENTHOUSE ROOF. FURTHERMORE. WITH CEILING HEIGHTS OF 8 FEET 4 INCHES AND THE USE OF A STEEL FRAME, THERE WAS NOT ENOUGH ROOM TO PASS DUCTWORK UNDER THE STRUCTURE. THUS, THE STEEL BEAMS AND GIRDERS WERE DESIGNED WITH OPENINGS TO ACCOMODATE FOR THE DUCTWORK AND PIPING.
CONSTRUCTION
RENOVATION OF 440 FIRST STREET BEGAN IN FEBRUARY 2012. THE RENOVATION SCHEDULE WAS APPROXIMATELY THIRTEEN MONTHS AND THE CONTRACT TYPE IS A GUARANTEED MAXIMUM PRICE CONTRACT. THE PROJECT COST WAS APPROXIMATELY 22 MILLION DOLLARS.
LIGHTING
THE INTERIORS ARE WELL LIT WITH LED FUXTURES, AND OTHER VARIOUS ENERGY SAVING LIGHT FIXTURES, THUS INCREASING THE OVERALL ENERGY EFFICIENCY. THE CURTAIN WALL AND THE MANY WINDOWS IN THE FACADE PROVIDE THE BUILDING WITH NATURAL DAYLIGHTING.